PULLMAN, Wash. The 205-foot tower crane, assembled as part of Washington State University’s Martin Stadium reconstruction, reaches an elevation of 2,774 feet and can lift eight tons. It also allows for a new perspective on the Pullman campus.
These photos, taken from the top of the crane, are courtesy of Hoffman Construction.